What to confirm before the first start-up

Commissioning is a check that your electric steam generator, water supply and electrical supply match the agreed project configuration before operation begins. You should confirm the model, destination voltage, phase, frequency and intended steam demand, then identify which water controls, pressure controls and alarm protections apply to your cabinet family.

First, compare your equipment details with the project configuration; the RDX range covers 3-360 kW and steam outputs of 4-500 kg/h, so use the figures for your selected model. Second, send your water source and available water analysis for review before deciding whether treatment is needed. Third, confirm the connected equipment and whether steam users will operate simultaneously, so your commissioning record describes the intended demand. For example, a commercial laundry should identify its washing machines, ironing tables and garment-finishing equipment before checking the generator against the proposed operating arrangement.

Water supply and feed-water checks

Feed water is the water supplied to your steam generator for heating and steam production. You should check its source, hardness and dissolved solids because heating and evaporating hard water forms scale on heating surfaces and inside pipework, while a softener removes hardness without reducing total dissolved solids in water.

First, send total hardness, TDS or conductivity, pH, chloride, iron and manganese, with silica and turbidity where available. Second, describe water temperature, seasonal changes and required flow; softener selection also depends on connected equipment and the regeneration cycle. Third, confirm how treatment will support the selected generator: the RDX-72L reference model produces 100 kg/h of steam, while a single-tank softener supplies no softened water during regeneration. For example, a commercial laundry planning simultaneous washing and ironing should include that operating pattern when requesting a feed-water treatment review for its site.

Electrical supply and safety checks before switching on

Electrical compatibility is a match between your site supply and the voltage, phase and frequency confirmed for your generator. You should compare those details before switching on and identify the protection features supplied with your cabinet family, because the RDX configurations differ in their controls and protective functions by series.

First, compare the selected rating with the reference supply options: models rated 12 kW and below use 220 V or 380 V, while models above 12 kW use 380 V. Second, confirm the destination configuration, including phase and 50/60 Hz frequency, against the quotation. Third, identify the fitted protections; S series cabinets have earth-leakage protection, while X series units have overheat and overpressure protection. For example, a laundry installing an RDX-18S should compare its site supply with the confirmed configuration for that 18 kW model before arranging its first run.

What the controls should show during the first run

Control monitoring is a check of water-level and pressure control, automatic water make-up and alarm protection during your generator’s initial operation. You should identify the functions fitted to your selected series before interpreting its display, since the RDX cabinet families use different control arrangements and provide different monitoring features.

First, record the selected model’s rated pressure and temperature; RDX reference parameters are 0.4-0.7 MPa and 150-170 C, respectively. Second, identify the relevant control behaviour: S series heating stops automatically at set pressure, while M series provides alarm and shutdown when limits are exceeded. Third, note the monitoring arrangement, including microcomputer real-time pressure monitoring on X series or PLC one-key operation on L series, and request clarification for any unclear indication. For example, a laundry commissioning an X series generator can include its pressure indications in the first-run record for review.

Routine care that prevents most breakdowns

Routine care is a programme of checks covering your generator’s feed water, fitted controls and protection functions. You should agree the maintenance tasks for your selected model and water conditions, because hard-water scale insulates heat-transfer surfaces and the supplied control and protection arrangements differ across the RDX cabinet families.

First, keep water analysis available for review and note changes in source or seasonal supply when discussing treatment needs. Second, account for regeneration if you use a softener: a single-tank unit interrupts softened-water supply during regeneration, while a twin-tank alternating unit maintains supply. Third, request model-specific care instructions for the fitted equipment; the RDX-72L is rated at 72 kW and includes the L series automatic feed-water pump and water tank arrangement. For example, a commercial laundry can include its softener regeneration arrangements in the care plan for its selected steam generator.

Records worth keeping for overseas projects

A project record is a file of your generator configuration, site supply details, water information and operating observations. You should keep these details together so a later technical enquiry can identify the equipment and conditions involved, including the destination electrical configuration and the controls supplied with your selected cabinet family.

First, retain the quoted model, rated output, voltage, phase and frequency; an RDX-144X reference model is rated at 144 kW and 200 kg/h. Second, keep water analysis alongside the source, temperature and any seasonal variation, plus the selected treatment arrangement. Third, record first-run observations, alarm indications and subsequent care work, identifying the fitted controls when requesting technical review. For example, an overseas laundry project can keep its equipment list, simultaneous steam demand and generator configuration together, giving future enquiries a concrete description of how the site intends to use steam.

Frequently asked questions

What should I check before starting an electric steam generator for the first time?

Check your selected model against the agreed electrical configuration, water supply and connected steam equipment. Confirm voltage, phase and frequency, then identify the fitted water-level controls, pressure controls and alarm protection. Send available water analysis and describe which steam users will run simultaneously at your site.

How long does an electric steam generator take to raise steam?

The RDX reference states that steam is available 3-5 minutes after start. Use this as a reference when discussing your selected generator and commissioning observations. Keep the model details, water information and intended steam demand together, and request clarification if your first-run observations differ from that reference.

What water should I feed an electric steam generator?

Your feed-water treatment needs should be reviewed against your water analysis and selected equipment. Hard water contains calcium and magnesium, which form scale during heating and evaporation. Send hardness, TDS or conductivity, pH, chloride, iron and manganese, plus your water source, temperature and any seasonal supply changes.

What routine care does an electric steam generator need?

Agree a care programme for your selected model, covering feed-water conditions and the fitted control and protection functions. Include any water-treatment equipment in that discussion. If you use a single-tank softener, schedule regeneration during downtime because softened water is unavailable while its tank regenerates. Keep care records.

What electrical supply does an electric steam generator require?

RDX models rated 12 kW and below have 220 V or 380 V options; models above 12 kW use 380 V. Voltage, phase and frequency can be configured for the destination country, including 50/60 Hz. Compare your site supply with the configuration confirmed at quotation before switching on.

What records should be kept for an overseas steam generator project?

Keep the quoted model and electrical configuration, water analysis, water source details and selected treatment arrangement. Add your connected equipment list and intended simultaneous steam demand. Record commissioning observations, alarm indications and care work, so a later enquiry includes the generator configuration and the operating conditions at your site.

Related equipment

Industrial Electric Steam Generator · Industrial Water Softener

Need help sizing a system for your site? Send us your inlet water analysis (TDS/hardness) and required capacity via WhatsApp or email and we’ll reply with a proposal.

WhatsApp +852 5762 0371 Email yeyiyulong@163.com or use the inquiry form

Ask Liangpu

WhatsApp